Example Installation: Concrete Batch Plant
Company: Lafarge Building Materials
Industry: Concrete
Application: Dust collection for batch plants
Description of installation: Nordfab Quick-Fit ductwork was used in a dust control system in a concrete batch plant. This installation is one of many — as Lafarge mandated use of Nordfab in their batch plants.